Skip To Main Content

Kitchen Modernization & MU Upgrade - El Dorado Middle School (2025)

Overview: The El Dorado Middle School Multi-Purpose Room is getting a major upgrade! As part of the upgrade, the exterior of the MUR will receive fresh new paint, new windows, door and hardware. The interior of the space will receive new finishes; including paint and flooring amongst other things. The major transformation will take place in the El Dorado Kitchen. The kitchen will be demolished down to the studs, a new layout, flooring, and new food service equipment will be installed. The new layout and equipment will allow staff to control devices on the District's network and smooth the flow of students coming in and out of the kitchen. 

Scope: HVAC upgrade, new flooring, painting, as well as upgrading existing multi-purpose building including the kitchen at El Dorado Middle School.

Location:

El Dorado Middle School
1750 West St, Concord, CA 94521

Estimated Cost: $3,238,804.00
Contractor: Beals Martin and Associates, Inc.
Funding Source: Measure J, School Safety and Classroom Improvement Measure
Bid Number:  #1963
Construction Manager: Sixth Dimension PMCM, Inc.

Site Newsletters