Technology Infrastructure Upgrades - Loma Vista Adult Center (2025)
Overview: The Technology Infrastructure Upgrade project will bring the District’s aging technology infrastructure to the 21st century and in line with the other neighboring school districts. Along with replacing and upgrading the vertical and horizontal cabling backbone, the project seeks to replace the old analog clock, bell, and phone system with a VoIP system to allow integration and information to travel through the campus like never before. Newly installed interior and exterior wireless access points will allow for a more rapid WiFi experience as individuals move throughout campuses.
Scope: Demolish and install new horizontal (cat6) and vertical (fiber) cabling. Replace existing wireless access devices with new devices. Remove existing analog clock, bell and speaker as well as the phones and replace with new VoIP pieces of equipment. Existing data rack cabinets will also be removed, re-cabled, and replaced.
| Location: |
Loma Vista Adult Center |
|---|---|
| Estimated Cost: | $1,896,710.20 |
| Contractor: | Bockmon & Woody Electric Co., Inc. |
| Funding Source: |
Measure J, School Safety and Classroom Improvement Measure Mt. Diablo Adult Education Capital Outlay |
| Bid Number: | #1948 |
| Construction Manager: | Sixth Dimension PMCM, Inc. |
Project Newsletters
Project Updates
| Date | Information |
|---|---|
| 2/12/2025 | 15.18 Review and Potential Approval of the Award of BID #1948 MDUSD Technology Infrastructure Upgrade at Loma Vista Adult Center |