Skip To Main Content

Technology Infrastructure Upgrades - Willow Creek Center (2025)

Overview: The Technology Infrastructure Upgrade project will bring the District’s aging technology infrastructure to the 21st century and in line with the other neighboring school districts. Along with replacing and upgrading the vertical and horizontal cabling backbone, the project seeks to replace the old analog clock, bell, and phone system with a VoIP system to allow integration and information to travel through the campus like never before. Newly installed interior and exterior wireless access points will allow for a more rapid WiFi experience as individuals move throughout campuses.

Scope: Demolish and install new horizontal (cat6) and vertical (fiber) cabling. Replace existing wireless access devices with new devices. Remove existing analog clock, bell and speaker as well as the phones and replace with new VoIP pieces of equipment. Existing data rack cabinets will also be removed, re-cabled, and replaced.

Location:

Willow Creek Center
1026 Mohr Ln, Concord, CA 94519

Estimated Cost: $927,850
Contractor: Vanden Bos Electric, Inc.
Funding Source: Measure J, School Safety and Classroom Improvement Measure
Bid Number:  #1947
Construction Manager: Sixth Dimension PMCM, Inc.

Project Newsletters

Google Drive Link